Title Optimizing Colorado Electric Transmission System
Status Senate Second Reading Laid Over to 05/08/2025 - No Amendments (04/17/2025)
Bill Subjects
  • Energy
House Sponsors
Senate Sponsors D. Roberts (D)
C. Simpson (R)
House Committee
Senate Committee Transportation and Energy
Date Introduced 02/05/2025
AI Summary
Summary

Current law requires the Colorado electric transmission authority
(authority) to conduct a study on the need for expanded transmission
capacity in the state and prepare a final report of the study on or before
January 31, 2025. Section 2 of the bill authorizes the authority to conduct
the study on a recurring basis and requires the authority to present a
statewide transmission plan, based on the results of the study, to the
Colorado public utilities commission (commission) and the legislature
every 3 years, beginning on or before September 1, 2027.
Section 2 requires the authority to consider advanced transmission
technologies in the study and identify certain projects that use advanced
transmission technologies. Advanced transmission technologies is
defined in section 1 as hardware or software technologies that increase
the capacity, efficiency, reliability, or resiliency of an existing or new
transmission facility.
Section 3 designates the authority as a statewide transmission
coordinator. Among other duties, the authority is required to facilitate
coordinated statewide planning; engage with regional and interregional
planning processes; and establish an expert advisory panel to review and
provide feedback on model inputs, assumptions, and approaches.
Under current law, an electric utility must submit an electric
resource plan to the commission for approval. Sections 4 and 5 require
an electric utility to:
  • Include in the electric resource plan a transmission plan
that identifies certain transmission resources and projects;
  • Incorporate in the electric resource plan an evaluation of
advanced transmission technologies or submit to the
commission an explanation of why advanced transmission
technologies are not included in the electric resource plan;
and
  • Provide model inputs and assumptions and other system
information or methodology consultation necessary to
support the authority in acting as a statewide transmission
coordinator.
Section 4 allows the commission to design incentives for a retail
electric utility that utilizes advanced transmission technologies.
Section 6 requires an electric utility to consider advanced
transmission technologies in the electric utility's 10-year transmission
plan.

Committee Reports
with Amendments
Full Text
Full Text of Bill (pdf) (most recent)
Fiscal Notes Fiscal Notes (03/28/2025) (most recent)  
Additional Bill Documents Bill Documents
Including:
  • Past bill versions
  • Past fiscal notes
  • Committee activity and documents
  • Bill History
 
Lobbyists Lobbyists
Audio [This feature is available by subscription.]  
Votes House and Senate Votes
Vote Totals Vote Totals by Party
 
 
 
Copyright © 2008-2025 State Capitol Watch